Ingenious Programmers IncorporationLet's talk →
Model 1 of 3
Senior engineers in your team

Staff augmentation

Senior engineers join your existing team, work inside your tooling and report on weekly timesheets.

  • Senior engineers, with five to six-plus years average experience
  • Weekly timesheets
  • Work inside your tooling
  • Skills across Python, TypeScript, cloud and ML tooling
Best for: Scaling an existing team fast with senior engineers.
Model 2 of 3
A product lane, owned end-to-end

Dedicated pod

A dedicated pod takes ownership of a product lane end-to-end and delivers weekly demo-able increments.

  • Weekly demo-able increments
  • End-to-end ownership of a product lane
  • Proof shipped with every feature
  • Honest status reports, with output
Best for: Owning a product lane end-to-end.
Model 3 of 3
Phase gates with acceptance proof

Fixed-scope project

Scope is written as testable gates before code is commissioned, and a clickable prototype settles look, flow and scope before backend spend. Delivery then runs through phase gates with acceptance proof.

  • Phase gates with acceptance proof
  • Acceptance criteria written before code
  • A clickable prototype before backend spend
  • Each requirement cross-referenced to its proof
Best for: Well-defined builds and migrations.
Compare

Side by side.

Staff augmentationDedicated podFixed-scope project
Best forScaling an existing team fast with senior engineers.Owning a product lane end-to-end.Well-defined builds and migrations.
CadenceWeekly timesheets, in your toolingWeekly demo-able incrementsPhase gates with acceptance proof
Not sure?

Which model fits you?

Three quick questions.

Question 1 of 3

Do you have an in-house engineering team?

The IPI quality system

Delivery you can audit.

1

Acceptance criteria first

Scope is written as testable gates before code is commissioned; a clickable prototype settles look, flow and scope before backend spend.

2

Proof ships with the feature

Test-mapping tables, mutation evidence, E2E video. Each requirement is cross-referenced to the artifact that proves it.

3

Compliance by architecture

Statutory deadlines live in the scheduler, money lives in a ledger, and outreach is scrubbed before it dials. Defaults inherited from our regulated-industry work.

4

Honest status, always

Failures are reported with output, not smoothed over. QA handover notes pre-empt the retest failures we know a platform will produce.

Questions

Common questions.

Staff augmentation suits scaling an existing team fast with senior engineers. A dedicated pod suits owning a product lane end-to-end. A fixed-scope project suits well-defined builds and migrations.

Start a project

Let's build your next platform.

Whether you work in property, healthcare, legal, small business or AI, we would like to show you what compliance-grade software feels like.